Sound Transit

Tacoma Hilltop Link Extension

Tacoma, WA

Overview

The Tacoma Link Expansion project includes the construction of 2.4 miles of Light Rail Transit service with six new stations, one relocated station, four Traction Power Substation sites and the expansion of the existing Operations and Maintenance facility.

Construction Management, Land Survey

As part of the support services team, Furtado is providing construction management support and Survey QV services for this project. Furtado led asset management database development for the project.  This included working with the Contractors to obtain information on key elements of the project for the operation and maintenance of the facility.  Our team provided input to RFIs (Request for Information) and submittals, coordinated with Sound Transit design staff, monitored delays and construction change orders, and supported the Office Engineer and Resident Engineer as required.

Right-of-Way Engineering

Furtado provided horizontal and vertical geometric alignment verification, structure, utility layout and clearance verification, along with Right-of-Way and easement verifications.

Similar Projects

Lynnwood Link Extension

Tukwila Sounder Commuter Rail Station

Spokane Street Bridge Overlay

West Seattle & Ballard Link Extensions

I-90 Fish Passages

Yesler Way Bridge

Small Generator Replacements

Index-Galena Road Construction Inspection Services

Federal Way Link Extension

East Link Extension

University District Station Building